Groundworks & Foundations

Setting out, dig, foundations, slabs, drainage and externals for plot-to-plot homes and small-site schemes — trench fill, raft, piled and underpin, taken on as a substructure-only package or as part of a wider build.

The package that decides the rest of the build.

Setting out, dig, drainage and slabs delivered to level and to programme — so the brickwork sub doesn't have to remediate a single course and the frame doesn't get held up. We hold the operative tickets, the plant relationships and the principal-contractor obligations, including on substructure-only packages.
“The slab was on programme and on level. The brickwork sub didn't have to remediate a single course.”
— Project manager, mid-size developer
Lewisham substructure — slab handed over level, programme beaten by four days.

Common questions

Yes — excavators and dumpers we run ourselves, hired-in for larger plant. Either way we hold the operative tickets and the principal-contractor relationship.

Yes. Substructure-only is a common scope for us — we hand off to the developer's main contractor at slab level.

Trench fill, raft, piled (CFA and mini-piling), and underpin. The choice flows from the SI and the engineer's design.

Let's Discuss your project

We have delivered building, refurbishment, and maintenance work across London for private clients, commercial operators, and public-sector organisations since 2006.

All work is fully insured and backed by 25 year guarantee